I-85 Spartanburg Cherokee Project Major Items % Complete
Detour Routes – Old Post Road – 85 SB
Detour Routes – Hampshire Drive – 85 NB
Detour Routes – Swofford Road
Exit 95 SB On-Ramp to I-85 Detour
Exit 95 NB and SB Detour
Exit 87 NB Off Ramp Detour
Exit 87 NB On Ramp Detour
White's Farm Road Detour
Exit 96 SB Off Ramp Detour
Lemmons Lane Detour
Exit 92 Detour
Exit 95 Detour
Exit 95 Detour Matthews Drive
Exit 95 NB On-Ramp Detour
Battleground Road Detour
Hampshire Drive
Wilcox Avenue Detour
Cannons Campground Road Detour
Phillips Drive Detour
Exit 92 - 85 NB On-Ramp and Loop Detour
Green River Road Detour
Green River Road Closure
US 221 over I-85 looking Southbound
I-85 Northbound Section 2 Shoulder Strengthening
I-85 Northbound Section 2 Shoulder Strengthening
US 221 over I-85 looking Northbound
Crews from Blythe Zachry, and their subcontractor Lane Hauling, at mile marker 77 SB
I-85 SB view of the existing Railroad Bridge
Existing Exit 92 looking I-85 Southbound
Exit 83 at SC 110
Mountain View Baptist Church is on the right
Crew from Blythe Zachry placing Concrete Pavement on I-85 SB
Crew from Blythe Zachry finishing the Concrete Pavement on I-85 SB
Inspectors from KCI and ICE testing the Concrete Pavement for SCDOT on I-85 SB
Concrete Paving Operation from Gossett Road looking North on I-85
Crews complete resurfacing of Dewberry Road after utility relocations
Mile marker 77 on 85 NB as traffic merges from 85 Business
Crews place concrete along 85 SB at Exit 80
Significant clearing and drainage work is occurring in the median from MM 82 to MM 87
The new bridge for Macedonia Road in underway at Exit 87
Work has begun on the new bridge at Exit 83. Shown here (from the West) with Builders First Source to the right
Girders will soon be placed across the travel lanes for the new bridge at Exit 87. – June 2019
We have placed girders over the SB lanes for the new Sunny Slope bridge. We are waiting on some work by Duke Energy to construct the East side abutment. – June 2019
Work is progressing on reconstructing the main travel lanes near mile marker 80. – June 2019
Work continues on drainage and rough grading in the median areas throughout the project.
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Wilcox Bridge
Sunnt Slope Looking South
Old Post Road Cul-de-sac
New Overlook Bridge
Exit 96 Looking North
Exit 95 Looking South
Exit 83 Looking South
Sunny Slope Bridge South
Sunny Slope Bridge North
Exit 96
Exit 95
Exit 87
Exit 83
CSX Bridge Looking Towards Spartanburg
CSX Bridge Looking South
CSX Bridge North
Girder Set 102 Bridge
New Bridge and Mainline at Sunny Slope
New Bridge at Exit 95
New NB Off-Ramp at Exit 102
Pleasant School Road at Exit 95
Exit 95 Looking to the North
Exit 83 looking to the Southeast
Removal of the old CSX railroad bridge – March 2023
Removal of the old CSX railroad bridge – March 2023
Removal of the old CSX railroad bridge – March 2023
Removal of the old CSX railroad bridge – March 2023